Line 1 (Nanchang Metro)
Other nameNanchang Rail Transit Line 1
Native name南昌地铁1号线
LocaleNanchang, Jiangxi, China
SystemNanchang Metro
StatusOperational
Open26 December 2015 (age 10)
Stations34
Linelength48.55 km
Speed km/h80
ElectrificationOverhead catenary, DC 1500 V
DepotJiaoqiao Train Shed
Yaohu MPD[1][2]
Stock6-car Type B

Nanchang Metro Line 1 (also known as Nanchang Rail Transit Line 1 in official documents) is the first rail transit line ever constructed in Nanchang and has opened in 2015. The Phase 1 of Line 1 runs from Shuanggang to Olympic Stadium, covered North Nanchang (Changbei, ), Old Town and East Nanchang (Changdong, ). It is planned in Phase 2 that Line 1 will be extended to Changbei Airport to the northwest and Maqiu () to the east.

Introduction

Nanchang Metro Line 1 shapes like the letter 'L', its Phase 1 is 28.737 km in length and includes 24 stations.[3][4] The average distance between stations is 1,251 m.[5] The construction has begun in 2009 and was finished by 2015.[6]

In the initial plan of 2008, Line 1 spanned from Yao Lake () in the east to Lehua () in the northwest, and is 35 km in length in the long-term plan,[7] which was confirmed in June 2013 again.[8]

  • East extension: Phase 2 extends Line 1 from Olympic Stadium on the west bank of Yao Lake to Maqiu on the east bank. This extension is planned to be 4 km in length, underground, and have 2 stations.
  • North extension: Phase 2 extends Line 1 to Changbei Airport via Lehua.

Opening timeline

SegmentCommencementLengthStation(s)Name
Shuanggang — Yaohu Lake West26 December 201528.737 km (17.86 mi)24Phase 1
Changbei Airport — Shuanggang28 June 2025[9]16.62 km (10.33 mi)8North extension
Yaohu Lake West — Maqiu4.34 km (2.70 mi)2East extension

Stations

Service RoutesStation nameConnectionsDistance
km
Location
EnglishChinese
●昌北机场KHN0.000.00Xinjian
●汇贤大道6.616.61
●建业大道1.568.17
●定子山2.8511.02
●冠山1.1512.17
●南齿1.6113.78
●方志敏大道0.9014.68
●蛟桥0.8415.52
●●双港1.0216.54
●●孔目湖1.2217.76
●●长江路3.0820.84Honggutan
●●珠江路1.2122.05
●●庐山南大道1.3123.36
●●绿茵路0.8924.25
●●卫东1.1825.43
●●地铁大厦0.9926.42
●●秋水广场0.7927.21
●●滕王阁2.0329.24Donghu / Xihu
●●万寿宫0.8130.05
●●八一馆0.5930.64
●●八一广场1.1031.74
●●丁公路北1.0532.79
●●师大南路1.0533.84Donghu / Qingshanhu
●●彭家桥0.8634.70Qingshanhu
●●谢家村0.7835.48
●●青山湖大道0.8036.28
●●高新大道1.1237.34
●●艾溪湖西1.3438.74
●●艾溪湖东1.8940.63
●●太子殿1.7242.35Nanchang Co.
●●奥体中心1.3343.68
●●瑶湖西1.3745.05
●●瑶湖东2.0647.11
●●麻丘1.4448.55

Rolling stock

The line is operated with Type B rolling stock at a maximum speed of 80 km/h. 27 trains of 6-car set, 162 cars in total will be operated at the first stage.[10] These cars are 2.8 m in width, 3.8 m in height and 19 m in length, providing the system with a maximum capacity of 30,000 to 55,000 passengers per hour per direction, and minimum service interval of 2 minutes.[11]

References

  1. ^ 南昌地铁1号线停车场设在蛟桥镇 建设项目面向全国招标
  2. ^ "Schematic diagram of Nanchang rail transit construction plan" (in Chinese). Archived 2014-12-25 at the Wayback Machine.
  3. ^ 南昌地铁一号线起点站双港大道站 邻近华东交大 Archived 2013-04-25 at archive.today
  4. ^ 南昌地铁1号线两标段招标
  5. ^ 南昌市轨道交通1号线一期工程系统设计06、08、09、11合同段资格预审招标公告 Archived 2015-04-18 at the Wayback Machine
  6. ^ 南昌地铁1号线推迟至2015年底通车 明确11个建设节点
  7. ^ "南昌地铁远景规划征询民意(图)". Archived from the original on 2017-08-31. Retrieved 2013-08-11.
  8. ^ 南昌地铁三四号线拟建19.7公里高架 1号线北延至昌北机场
  9. ^ "南昌地铁1、2号线延长线6月28日10点18分开通!!". 2025-06-25.
  10. ^ 南昌地铁1号线24个车站确定 将拆除中山桥
  11. ^ 南昌地铁拟采用B型车 单向每小时载乘客5.5万人次